SHSubjectHub

Lean production and its impact on costs

Edexcel 9EB0T2-3cA-levelLesson packSubscription
Also online

This worksheet marks itself

Set it as homework or classwork and every answer is marked as pupils go, with feedback on what they got wrong. The scores go straight into your mark book, so you can see who needs help before the next lesson.

  • 9 questions
  • 40 marks
  • about 50 minutes
  • marked instantly

Question types: multiple choice, calculation, extended answer, fill the gap, matching.

About this resource

Edexcel Economics B (9EB0) Theme 2, Unit T2-3 (spec refs 2.3.3, 2.3.4) — quality control, quality assurance and Total Quality Management; Kaizen; Just-In-Time vs Just-In-Case stock management; how lean production reduces waste and average costs; synthesises with productivity (3a) and capacity uti…

16 slides.

Lesson outline

  1. Do Now — Retrieval
  2. Quality Control, Quality Assurance and TQM
  3. Hinge Check — QC vs QA
  4. Kaizen — Continuous Improvement
  5. Just-In-Time (JIT) vs Just-In-Case (JIC)
  6. Hinge Check — The Real Risk of JIT
  7. Lean Methods and Their Cost Impact
  8. Hinge Check — What Counts as 'Waste'?
  9. Apply It — Amara's Bakery
  10. Main Activity — Match the Lean Method
  11. Productive Efficiency: Bringing It Together
  12. Exam Practice — Assess (10 marks)
Unit bundleTheme 2 · The wider economic environment
Part of: Theme 2 · The wider economic environment: the whole unitEvery resource in the unit in one zip.

More from Theme 2 · The wider economic environment